MCQ IN COMPUTER SCIENCE & ENGINEERING

COMPUTER SCIENCE AND ENGINEERING

SOFTWARE ENGINEERING

Question [CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
COCOMO stands for ____
A
constructive cost Model
B
common control Model
C
composition cost Model
D
consumed cost Model
Explanation: 

Detailed explanation-1: -The Constructive Cost Model (COCOMO) is a procedural software cost estimation model developed by Barry W. Boehm. The model parameters are derived from fitting a regression formula using data from historical projects (63 projects for COCOMO 81 and 163 projects for COCOMO II).

Detailed explanation-2: -ANSWER: Constructive Cost Estimation Model.

Detailed explanation-3: -COCOMO or Constructive Cost Estimation Model is a model that estimates the effort and time taken to complete the model based on the size of the source code. It includes 15 multiplying factors from different attributes of the project, and finally calculates time and effort using this information.

Detailed explanation-4: -COCOMO model provides an accurate size of the project parameters. It is good for a quick estimate of the cost. The estimated effort and scheduled time are given by the relationship as follows.

There is 1 question to complete.