Match the List 1 to List 2 and choose the correct option.1. Requirement Elicitation ____ a. Module Development and integration.2. Design ____ b. Analysis3. Implementation ____ c. Structure and behavioral4. Maintenance ____ d. Performance tuning.
A
1-c, 2-a, 3-d, 4-b
B
1-c, 2-a, 3-b, 4-d
C
1-a, 2-c, 3-d, 4-b
D
1-b, 2-c, 3-a, 4-d
Explanation: 

Detailed explanation-1: -Explanation: As-is Scenario, Visionary Scenario, Evaluation Scenario and Training Scenario are the four scenarios in requirement elicitation activities.

Detailed explanation-2: -Requirement Elicitation Activities Finding more about the problem to be solved. Describe the functionalities of the system and non-functional attributes. Increase the performance of the system. Reduces hardware constraints.

Detailed explanation-3: -Requirements elicitation practices include interviews, questionnaires, user observation, workshops, brainstorming, use cases, role playing and prototyping. Before requirements can be analyzed, modeled, or specified they must be gathered through an elicitation process.

Detailed explanation-4: -Therefore, requirements gathering is the perfect first step in the process of requirements elicitation.