Which of the following problems can be considered to be contributing to the present software crisis?
|
large problem size
|
|
lack of rapid progress of software engineering
|
|
lack of intelligent engineers
|
|
shortage of skilled manpower
|
Explanation:
Detailed explanation-1: -Causes of Software Crisis: The cost of owning and maintaining software was as expensive as developing the software. At that time Projects were running over-time. At that time Software was very inefficient. The quality of the software was low quality.
Detailed explanation-2: -Example: The production of the os/360 system is a good example of the software crisis. The os/360 was to be produced with the system/ 360 mainframe. Its production started in the 1960 and was planned that by 1966 would be produced.