Question [CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
Gamesa has received order from KCT Renewable Energy Pvt Ltd for a 40 MW wind power project located in which state
A
Andhra Pradesh
B
Madhya Pradesh
C
Haryana
D
Odisha
Explanation: 

Detailed explanation-1: -Gamesa, an Indian renewable energy firm, today announced a 40 MW wind power project from KCT Renewable Energy. The project will be commissioned in Molagavalli site in Andhra Pradesh.

Detailed explanation-2: -Gujarat has 142, 560 MW wind power potential at 120-metre above ground level – the highest wind potential among all states.

Detailed explanation-3: -Tamil Nadu – Tamil Nadu tops the list of states with the largest installed wind power generation capacity in the country.

Detailed explanation-4: -Jiuquan Wind Power Base, China Jiuquan Wind Power Base is the world’s biggest wind farm, with a planned installed capacity of 20GW. Also known as Gansu Wind Farm, it will feature 7, 000 wind turbines installed across the Jiuquan, Inner Mongolia, Hebei, Xinjiang, Jiangsu and Shandong provinces of Gansu, China.