Railway ministry launched by _________application PMIS to monitor Railway projects.
A
e-enabled
B
Application form
C
Both of the above
D
None of the above
Explanation: 

Detailed explanation-1: -PMIS. e-enabled Project Monitoring and Information Systems.

Detailed explanation-2: -Mission 100% Electrification: Indian Railways completes electrification of 82 per cent of total broad gauge network. Indian Railways has achieved 1223 Route Kilometers (RKMs) of electrification as compared to 895 RKMs during the corresponding period of FY 2021-22.

Detailed explanation-3: -In the General Budget (2021-22), Rs. 225 crores has been allotted for this project. In India, the Howrah–Nagpur–Mumbai line (also known as Mumbai–Kolkata line) is a railway line connecting Kolkata and Mumbai via Nagpur. It is a 1, 968-kilometre-long railway line.

Detailed explanation-4: -Central Organisation for Railway Electrification (CORE) was set up in 1979 under the Ministry of Railways, at Allahabad. The responsibility entrusted was to carryout railway electrification over the entire network of Indian Railways. CORE currently has 11 project units operating from different locations viz.