How many unit of Megawatt Commissioned at Sainj Hydropower Project?
|
100
|
|
500
|
|
250
|
|
350
|
Explanation:
Detailed explanation-1: -The first 50 MW unit of 100 MW Sainj Hydro Power project of Himachal Pradesh Power Corporation Limited (HPPCL) commissioned and synchronised with northern grid through Parvati-Kol Dam transmission line.
Detailed explanation-2: -1.5 crore per MW for upto 200 MW projects and Rs. 1.0 crore per MW for above 200 MW projects.
Detailed explanation-3: -About Malana Power MPCL operates Malana Hydro Electric project which is located on the river of Malana in the Kullu district which holds a capacity of generating 86 MW of power.