Which ministry Signs MoU With IL & FS For Construction Of Zojila Tunnel?
|
Ministry Of Road Transport & Highways
|
|
Ministry of Telecommunication
|
|
Ministry of Railways
|
|
Ministry of Commerce
|
Explanation:
Detailed explanation-1: -Current Status As of September 2022, 2.1 km (15%) of tunneling work has been completed. Zoji La Tunnel is expected to completed and opened in 2027 beyond its 2026 deadline.
Detailed explanation-2: -The tunnel will connect Baltal in Kashmir with Minamarg in Ladakh. “This will reduce travel time by two and a half hours. Once the tunnels are through, one can drive from Sonamarg to Minimarg in less than 30 minutes.
Detailed explanation-3: -This 13.145-km-long highest motorable road tunnel in the continent is located in the beautiful maze of steep mountains in Jammu & Kashmir.