CURRENT AFFAIRS

2020

Question [CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
APGCL is to set up a waste-to-energy plant in which state?
A
Arunachal Pradesh
B
Bihar
C
Assam
D
Andhra Pradesh
Explanation: 

Detailed explanation-1: -The Assam Power Generation Corporation Ltd (APGCL) is planning to set up a waste-to-energy plant in Guwahati.

Detailed explanation-2: -Waste management concessionaire Ecogreen Energy will set up a 25-MW waste-to-energy plant on 10 acres of land at Bandhwadi, located on the Gurugram-Faridabad road.

Detailed explanation-3: -Moradabad Waste to Energy Power Plant is a 250MW biopower project. It is planned in Uttar Pradesh, India.

Detailed explanation-4: -Gurugram: Haryana Urban Local Bodies (ULB) Minister Dr Kamal Gupta inaugurated the construction work for the country’s largest waste-to-energy (WTE) plant in Gurugram on Friday.

Detailed explanation-5: -GMC is divided into 31 wards and there is one NGO each assigned for the job of Primary Collection and Street Sweeping within the respective ward. The NGOs deposit the waste so collected to the nearby secondary collection bins. The work of Primary Collection is monitored by the JTOs and Sanitary Supervisors of the ward.

There is 1 question to complete.