India’s first interstate connected wind power project is commissioned in
A
Kanpur, Uttar Pradesh
B
Tezpur, Assam
C
Bhuj, Gujarat
D
Ludhiana, Punjab
Explanation: 

Detailed explanation-1: -New Delhi, Aug 24 () The Ministry of New and Renewable Energy today said 126 MW wind power capacity, part of country’s first inter state transmission system (ISTS) auction, is commissioned in Bhuj.

Detailed explanation-2: -The first wind farms in India were installed in the year 1986. It was set up in coastal areas of maharsthra (Ratnagiri), Gujarat (Okha), and Tamil Nadu (Tirunelveli).

Detailed explanation-3: -Tamil Nadu is a leader in Wind Power in India. The largest capacity wind turbine of 4.2 MW is installed in Tamil Nadu state as of October 2022. In Muppandal windfarm, the total capacity is 1500 MW with nearly 3000 wind turbines, the largest wind power plant in India.

Detailed explanation-4: -First Offshore Wind Project of India (FOWPI) is planned to achieve 200MW sized offshore wind farm near the coast of Gujarat, approx. 25km from Jafarabad. FOWPI emphasis on finalisation of design and technical specification of the windfarm including foundations, structures, turbines etc.

Detailed explanation-5: -Around 1910, the first wind turbines were built in Europe. Later, the development of wind power in India began in the 1986 with first wind farms being set up in coastal areas of Maharashtra, Gujarat and Tamil Nadu with 55kW Vestas wind turbines. The capacity has significantly increased in the last few years.