What should you do with a large project? (choose all that apply)
|
Chunck
|
|
Avoid
|
|
Tackle
|
|
Block
|
Explanation:
Detailed explanation-1: -The Project Lifecycle consists of seven phases intake, initiation, planning, product selection, execution, monitoring & control, and closure. These phases make up the path that takes your project from start to finish.
Detailed explanation-2: -The project management triangle is made up of three variables that determine the quality of the project: scope, cost, and time. The triangle demonstrates how these three variables are linked-if one of the variables is changed, the other two must be adjusted in order to keep the triangle connected.
Detailed explanation-3: -initiation. planning. execution. monitoring and control. closure.