Which number is expressed correctly?
A
The meeting began at ten a.m.
B
Jerry is responsible for 1/3 of the project.
C
Building a new school is projected to cost $10 million.
D
There are 4 puppies at the animal shelter.
Explanation: 

Detailed explanation-1: -The three types of cost estimates are design, bid, and control estimates. Design estimates are prepared in the project preliminaries which gives the order of magnitude of the project cost. Bid estimates are used in the tendering phase of the project which details project overheads and other indirect costs.

Detailed explanation-2: -Consists of all costs specific to a project incurred prior to the start-up of facility operation. All research and development, operating, plant, and capital equipment costs specifically associated with a project.