Managerial Bottleneck arises due to
A
Lack of managerial capacity
B
Lack of infrastructure
C
Adequate managerial resources
D
Inadequate managerial resources
Explanation: 

Detailed explanation-1: -So in the context of a factory floor, an operational bottleneck in manufacturing is a work stage that requires more work requests than it can actually process at its maximum throughput capacity. This results in an interruption to the steady flow of production and delays the overall production process.

Detailed explanation-2: -A bottleneck occurs when there is not enough capacity to meet the demand or throughput for a product or service. It is called a bottleneck since the neck of a bottle narrows and tapers, restricting the amount of liquid that can flow out of a bottle at once.

Detailed explanation-3: -A bottleneck is any point of congestion in a project that causes delays in the workflow. Bottlenecks in project management reduce the pace of the project due to limited capacity.

Detailed explanation-4: -Bottlenecks happen when work or request volume exceeds process capacity or bandwidth. In business, a bottleneck is a point (or points) in a process where the flow of work becomes delayed or breaks down completely.