SOFTWARE ENGINEERING

REQUIREMENTS ENGINEERING

REQUIREMENTS GATHERING AND ANALYSIS

Question [CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
Which of the following is called a working prototype?
A
Form study prototype
B
Visual prototype
C
Functional prototype
D
Proof-of-principle prototype
Explanation: 

Detailed explanation-1: -The be-all and end-all of product testing is a functional prototype. Also called a working prototype, it makes users feel as if they’re interacting with the real thing and includes as much as possible features, graphics, and content intended to appear in the final product.

Detailed explanation-2: -The 4 types of project prototyping are feasibility prototypes, low-fidelity user prototypes, high-fidelity user prototypes and live-data prototypes.

Detailed explanation-3: -A prototype is a basic working model, mock-up or a simple simulation of the product which leads us to create a minimal viable product to final product and variations.

Detailed explanation-4: -Rapid Throwaway Prototyping. Evolutionary Prototyping. Incremental Prototyping. Extreme Prototyping. 16-Nov-2022

There is 1 question to complete.