A table listing required materials and items is called ____
A
Contour Lines
B
Schedule
C
Plan
D
Tread
Explanation: 

Detailed explanation-1: -Every line of the bill of materials (BOM) includes the product code, part name, part number, part revision, description, quantity, unit of measure, size, length, weight, and specifications or features of the product.

Detailed explanation-2: -A bill of materials (BOM) is a structured list identifying all materials and components required to construct a product, as well as the instructions for procuring and using the materials.

Detailed explanation-3: -A BOM, or a “bill of materials, ‘’ is an itemized list of every single raw material, part, and component needed to manufacture a product. A BOM also lists how much of each item is required and even includes secondary requirements like manuals, guides, and packaging.