Static multi-variable model was developed by
A
SEL
B
W-F
C
Boehm
D
None of these
Explanation: 

Detailed explanation-1: -A dynamic multivariate model projects resource requirements as a fnnction of time. A theoretical approach to dynamic multivariable modeling hypothesizes a continuous resource expenditure curve and from it, derives equations that model the behavior of the resource.

Detailed explanation-2: -Effort estimation is the process of forecasting how much effort is required to develop or maintain a software application.