An activity in a network has the following characteristics:ES = 12, EF = 22, and LS = 14. ES and LS relate to the beginning of the week, whereas EF relates to the end of the week. The duration of the activity is:
A
8.0 weeks.
B
11.0 weeks.
C
12.0 weeks.
D
14.0 weeks.