SOFTWARE ENGINEERING

SOFTWARE PROJECT MANAGEMENT

QUALITY MANAGEMENT

Question [CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
PDCA is an interactive four-step management method used in business for the control and continuous improvement of processes and products which means Plan, Do, ____, and Act.
A
Cite
B
Check
C
Censor
D
Calibrate
Explanation: 

Detailed explanation-1: -PDCA stans for plan, do, check, act, whereas PDSA stands for plan, do, study, act. They are both iterative, four-stage problem-solving models used to improve a process.

Detailed explanation-2: -PDCA or the Deming cycle is a management methodology that aims to continually improve processes. This cycle is based on four stages: plan, do, check, and act. To adapt to market changes, improve efficiency, boost productivity, and meet the needs of your customers, having a method is required.

Detailed explanation-3: -The PDCA/PDSA cycle is a continuous loop of planning, doing, checking (or studying), and acting. It provides a simple and effective approach for solving problems and managing change. The model is useful for testing improvement measures on a small scale before updating procedures and working practices.

Detailed explanation-4: -What Are the 4 Steps of the PDCA Cycle? PDCA cycle is an iterative process for continually improving products, people, and services. It became an integral part of what is known today as Lean management. The Plan-Do-Check-Act model includes solutions testing, analyzing results, and improving the process.

There is 1 question to complete.