You are leading a research project that will require between 10 and 20 aerospace engineers. Some senior-level aerospace engineers are available. They are more productive than junior-level engineers, who cost less and who are available as well. You want to determine the optimal combination of senior-and junior-level personnel. In this situation, the appropriate technique to use is to:
A
Conduct a design of experiments
B
Use the Ishikawa diagram to pinpoint the problem
C
Prepare a control chart
D
Analyze the process using a Pareto diagram
Explanation: 