Question 61 of 100Question ID:613828A construction site is located in an earthquake-prone area. After spending considerable time discussing and analyzing this risk, the team agreed that the best way to deal with this risk was to build an earthquake-resistant foundation using a high-grade concrete. However, several weeks into construction, the project manager learns that this special type of concrete was never ordered, even though the risk response was documented in the risk register. The project will now have to be suspended.What most likely went wrong?
A
AThe project team failed to have a fallback plan.
B
BThe risk was never documented in the risk register.
C
CNo action has been taken to implement the risk response.
D
DThe risk response was not approved by the change control board.
Explanation: 

Detailed explanation-1: -Steel plate walls system When such infill plates occupy each level within a framed bay of a structure, they constitute a SPSW system. Whereas most earthquake resistant construction methods are adapted from older systems, SPSW was invented entirely to withstand seismic activity.

Detailed explanation-2: -Bamboo-based housing systems are prevalent as a vernacular type of construction in many parts of the world where bamboo is available locally. Even in India, bamboo-based houses are not so uncommon, especially in the north-eastern part, which is seismically the most vulnerable zone.

There is 1 question to complete.