SOFTWARE ENGINEERING

SOFTWARE TESTING

TESTING PRINCIPLES AND CONCEPTS

Question [CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
Integration bugs occur when the interfaces are integrated in between the assumed tested components
A
True
B
False
C
Either A or B
D
None of the above
Explanation: 

Detailed explanation-1: -Integration bugs occur when the interfaces are integrated in between the assumed tested components-Software Testing Quiz. The test levels are performed in which of the following order? Explanation : The Test levels can always be restructured or combined based on n the nature of a project or system planning.

Detailed explanation-2: -As mentioned in above point Integration testing is performed to verify the end to end functionality of the integrated components. On other hand Interface testing is carried out to test an interface to verify its functionality. Integration testing due to its nature can carried in ways i.e manual as well as automated.

Detailed explanation-3: -Answer-A) The key objective of integration testing is to resolve interface errors.

Detailed explanation-4: -Hence, we conclude that Planning is not a characteristic of a good test.

There is 1 question to complete.