All of the following are examples of the cost of nonconformance EXCEPT:
|
Rework
|
|
Quality training
|
|
Scrap
|
|
Warranty costs
|
Explanation:
Detailed explanation-1: -Costs of non-conformance can include things such as payments made out on warranties, re-work or scrap, and/or damage to reputation.
Detailed explanation-2: -Solution: Cost Of Quality include Prevention Cost, Failure Cost, Appraisal cost, Internal Failure and External Failure Cost. Build Cost is not the part of cost of Quality. Therefore, Option D is correct.
Detailed explanation-3: -The correct answer is d) Queuing model. This is not a tool that is used in total quality management.