Question
[CLICK ON ANY CHOICE TO KNOW THE RIGHT ANSWER]
|
|
At the end of the production process
|
|
Never
|
|
At the start of the production process
|
|
At each stage of the production process
|
Detailed explanation-1: -Conclusion: Quality Assurance is to check whether the product developed is fit for use. For that, Organization should have processes and standards to be followed which need to be improved on a periodic basis.
Detailed explanation-2: -Quality assurance This is where quality is built into the production process. For example, all staff check all items at all stages of the production process for faults. In this way everyone takes responsibility for delivering quality.
Detailed explanation-3: -Quality Assurance begins very early and continues throughout the life cycle of the project. Since this process uses some of the outputs of the plan quality process, it is not performed until after Plan Quality is performed. Quality Audit is a key tool used in this process.
Detailed explanation-4: -Essentially, the process of QA can be broken down into 5 key stages: discovering, planning, designing, executing, and improving. The QA team helps define functional and non-functional software requirements and checks how those correlate with business objectives.