Process control is carried out
|
before production
|
|
during production
|
|
after production control
|
|
All of the above
|
Explanation:
Detailed explanation-1: -In-process controls are permitted in the manufacturing area as long as they do not jeopardise production. It means that caution must be used when sampling or testing.
Detailed explanation-2: -Closed Loop :– automatic control. Open Loop :– manual control. Feedback control is error correction following a disturbance. Feedforward control is control of disturbances, which could cause a process error.